Optimum Design of Composite Steel Igirder Bridges

Full item record

dc.contributor.authorÜlker, Fatma
dc.contributor.authorİnce, Ragıp
dc.contributor.organizationMinistry of Forestry and Water Management, Ankara, Turkeyen
dc.contributor.organizationFırat University, Elazığ, Turkeyen
dc.date.accessioned2018-09-27T13:30:36Z
dc.date.available2018-09-27T13:30:36Z
dc.date.issued2018
dc.description.abstractIn this study, the analysis and optimum design of composite steel I-Girder straight bridges were performed by CSiBridge package program. Optimum design of the bridge is made according to the AASHTO LRFD specification. The HL-93 truck in the AASHTO specification is considered as vehicle load. Two-span composite steel I-girder bridge was optimized for the application. The results obtained here are compared with the results of conventional bridge solutions.en
dc.identifier.urihttps://open.icm.edu.pl/handle/123456789/15840
dc.language.isoen
dc.publisherBGJ Consultingen
dc.rightsUznanie autorstwa-Użycie niekomercyjne-Na tych samych warunkach 3.0 Polska*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/pl/*
dc.subjectbridge designen
dc.subjectAASHTO LRFDen
dc.subjectoptimum designen
dc.subjectsteel girderen
dc.titleOptimum Design of Composite Steel Igirder Bridgesen
dc.typearticleen
Files for this record
Original bundle
Now showing 1 - 1 of 1
Name: CEPPIS_2018_ost_275-end.pdf
Size: 292.49 KB
Format: Adobe Portable Document Format
Description:
License files
Name: license.txt
Size: 450 B
Format: Item-specific license agreed upon to submission
Description:
Name: license_rdf
Size: 1.01 KB
Format: RDF serialized in XML
Description:
Belongs to collection